Our significant advantage is we can provide professional engineering serivce as:
|
|
|
|
Product develop and Engineering Service |
|
1. Concept Development |
3D visualizing and rendering |
2. Detailed Product Design |
Advanced 3D and 2D modeling in different CAD software (Pro/Engineer, Solidworks, CATIA ect.) |
3. Rapid Prototyping |
SLA, SLS 3D printing; Rapid soft tool in 2 weeks |
4. Design optimization |
Finite Element Analysis (FEA), Tolerance Analysis, Failure modes and effects analysis (FMEA) |
5. Tool Optimization |
Optimize and verify injection molding tools by MoldFlow Analysis |
6. Product Verification Test |
Different kinds of product tests defined by customer |
7. Documentation |
Prepare and translate all documents in customer preferred format |
Novosk provide both stardardproduct sourcing and custom munafactured product sourcing. We try to find the product that exist in the market first, if not, we will custom make them according drawing or samples.


Most our sub-suppliers are ISO 9001 certified, and some are even TS 16949
approved.
APQP process includes: Six sigma, PPAP, FMEA, SPC and MSA methods are used in production for ensure consistent high quality. And all products can be tested according to customer's specification and delivered with certification like ROHS, REACH, CE, UL etc. We can also deliver marine parts with special certification by ABS,BV,GL,DNV,LR,KR,NK.
And products can be tested according to customer's specification.
Furthermore, we do final check in our own warehouse before each shipment.
4. Global Logistics and Warehousing:
All products can be packed according to customer's requirement, OEM labeled.
Novosk take care all logistics from factory in China and deliver the goods to your door in your home country.

Shipments can be delivered with duty paid to the customer's address, including freight, custom clearance, at no additional charges.
Company Quick Presentation
Short presentation of the company (PDF)
More...
Custom Manufacturing Product Catalog
Download our latest product catalog (PDF)
More...
Metal Injection Molding (MIM)
A low cost, high quality alternative to machining, investment casting and other manufacturing processes...
More...
Tips for sourcing from China
If you chose the wrong supplier and have to switch later, what you lose is not only money, but precious time.
More...



